1、 1、DETAILS OF THE STRUCTURES SUPPORTING THE DECK CRANE ARE TO BE SUBMITTED FOR OUR APPROVAL ALONG WITH THE DESIGN VERTICAL REACTION LOAD AND OVER AND OVERTURING MOMENT 2、 2、SUBJECT TO OUR REVIEW OF ENGINE ROOM AND SUPERSTRUCTURE DRAWINGS. 3、 3、SUBJECT TO OUR REVIEW OF FORE END STRUCTURE 4、 4、PROVIDE SUITABLE DECK TRANSVERSE MEMBERS ALIGNED WITH SIDE TRANSVERSE WEB. (SEE DWG OM-GFW50616-021-022A" TYPICAL SECTIONS IN CARGO TANK AREA) 5、 5、SUBJECT TO OUR REVIEW OF AFT END STRUCTURE 6、 6、CLEAR OPENING SIZE (TYP.) 7、 7、BULWARK TO BE SUITABLY REINFORCED IN WAY OF MOORING PIPES. DOUBLING OR THICK INSERT PLATES ARE TO BE FITTED IN WAY OF HAWSE PIPES. 8、 8、BOTTOM FORWARD STRENGTHENING IS BASED ON A MINIMUM FORWARD DAFT AT FP OF 4.5M MOLDED. 9、 9、TO BE FULL PENETRATION WELDING. (TYP.) (SEE DWG. OM-GFW50616-021-034QTA "WELDING SCHEME FOR HULL STRUCTURE MEMBERS (ONLY CARGO TANK)") 10、 10、SUBJECT TO OUR REVIEW OF DWG. OM-GFW50616-021-005 "CONTAINER STANCHIONS ON UPPER DECK". (TYP.) 11、 11、ZERO TOLERANCE FOR MISALIGNMENT DURING CONSTRUCTION. SEE COMMENT NO. S-010. 12、 12、TO BE FULL PENETRATION WELDING. (TYP.) 13、 13、(TO BE CONSISTENT WITH THAT SHOWN ON SHEET 3/5 OF DWG. OM-GFW50616-021-002A "TYPICAL SECTIONS IN (CARGO TANK AREA) AND THIS DRAWING.) 14、 14、TO BE FULL PENETRATION WELDING (TYP.) (SEE DWG.OM-GFW50616-021-034QTA "WELDING SCHEME FOR HULL STRUCTURE MEMBERS (ONLY CARGO TANK)") 15、 15、"CONTAINER STANCHIONS ON TO BE FULL PENETRATION WELDING. (TYP). UPPER DECK". (TYP.) 16、 16、SEE COMMENT ON "TYPICAL SECTIONS IN CARGO TANK AREA" 17、 17、TO BE PENETRATION WELDING. (TYP.) 18、 18、SEE COMMENT ON "TYPICAL SECTIONS IN CARGO TANK AREA" 19、 19、FOR HULL STRUCTURE MEMBERS (ONLY CARGO TANK)") 20、 20、ZERO TOLERANCE FOR MISALIGNMENT DURING CONSTRUCTION, SEE COMMENT NO. S-010. 21、 21、"WELDING SCHEME FOR HULL STRUCTURE MEMBERS (ONLY CARGO TANK)") |