the suction side from the slop tank shal also be connected by approved segregation to the suction pipe interconnection between the cargo pump.
这里面的segregation应当怎么理解呀??
原帖由 large312 于 2007-8-22 15:16 发表
the suction side from the slop tank shal also be connected by approved segregation to the suction pipe interconnection between the cargo pump.
这里面的segregation应当怎么理解呀??