|
发表于 2007-8-19 20:05
|
显示全部楼层
来自: 中国河北秦皇岛
m.generator fitting check approved(deflectand absorbor), lube oil charging in oil pan, fuel oil piping flushed and approved, fuel oil system check over and charge diesel oil into tank,main switchboard protection check over, starting up air system check over, control system checkover, cooling water system check over, electricity shore supply connecting, alarm point check over |
|