Many Valve wheel handle (V001,V004....) on floor deck of E/R was obstructed or touched to ladder/hand guide; or hided under ladder, it is not convenience to operation routine, Please check on board and modify for satisfy.
DESIGN REPLY:Since the piping arrangement of sea water ballast treatment system was designed for preset space of ballast water filter,we have to set the ladder as now condition. And we will investigate it and modify it
船方提出: E/R层甲板上的多个阀轮手柄(V001,V004....)被堵塞或触及梯子/手动导向;或藏在梯子下,不方便操作,请上船检查并修改以满足要求。
设计回答:由于海水压载水处理系统的管道布置是为预先设定的压载水过滤器空间设计的,所以我们必须将梯子设置为现在的状态。我们将调查并修改它。