正式员工
- UID
- 51138
- 积分
- 966
- 金币
-
- 活跃
-
- 阅读权限
- 50
- 注册时间
- 2008-11-30
- 最后登录
- 1970-1-1
|
发表于 2012-3-6 13:30
|
显示全部楼层
来自: 中国江苏扬州
123dodo 发表于 2011-10-5 10:44
这个开口应该是错误的,通常舭龙骨只在扁钢对接的焊缝离舭列板40mm处开D20mm的止裂孔。
同意你的说法,应该是错误的,根据CSR的要求不能有除止裂空以外的空。
6.5.2 Bilge keel
Bilge keels are not be welded directly to the shell plating. An intermediate flat is required on the shell plating.
The ends of the bilge keel are to be sniped as shown in Fig.18 or rounded with large radius. The ends are to be
located in way of transverse bilge stiffeners inside the shell plating and the ends of intermediate flat are not to be
located at the block joints.
The bilge keel and the intermediate flat are to be made of steel with the same yield stress as the one of the bilge
strake. The bilge keel with a length greater than 0.15L is to be made with the same grade of steel as the one of
bilge strake.
The net thickness of the intermediate flat is to be equal to that of the bilge strake. However, this thickness may
generally not be greater than 15 mm.
Scallops in the bilge keels are to be avoided.
13 Bilge Keels
Bilge keels where fitted, are to be attached to the shell by a doubler. In general, both the bilge keel and the
doubler are to be continuous. The connections of the bilge keel to the doubler and the doubler to the shell,
are to be by double continuous fillet welds.
Butt welds in the bilge keel and doubler are to be full penetration and are to be kept clear of master
erection butts. In general, shell butts are to be flush in way of the doubler, and doubler butts are to be flush
in way of the bilge keel. In general, scallops and cutouts are not to be used. Where desired, a drilled crack
arresting hole, at least 25 mm (1 in.) in diameter, may be provided in the bilge keel butt weld as close as
practicable to the doubler.
The ends of the bilge keel are to be suitably tapered and are to terminate on an internal stiffening member.
The material tensile properties for bilge keels and doublers are to be as required for the bottom shell
plating.
|
|