Unearthed System 1. IT system unearthed (high impedance earthed neutral)First Letter I = the neutral is unearthed at Transformer or Generator side.
Second Letter T = Frame parts of the loads are interconnected and earthed at Load Side

System characteristics
  • It is compulsory to install an over voltage limiter between the MV/LV transformer neutral point and earth.
  • If the neutral is not accessible, the overvoltage limiter is installed between a phase and earth.
  • It runs off external over voltages, transmitted by the transformer, to the earth and protects the low voltage network from a voltage increase due to flashover between the transformer’s medium voltage and low voltage windings.
Advantages
  • System providing the best service continuity during use.
  • When an insulation fault occurs, the short-circuit current is very low.
  • Higher operational safety only a capacitive current flows, which is caused by the system leakage capacitance if an earth fault occurs.
  • Better accident prevention the fault current is limited by the body impedance, earthing resistance and the high impedance of the earth fault loop.
Disadvantages
  • Requires presence of maintenance personnel to monitor and locate the first fault during use.
  • Requires a good level of network insulation (High leakage current must be supplied by insulating transformers).
  • Overvoltage limiters must be installed.
  • Requires all the installation’s exposed conductive parts to be Same Voltage level. If this is not possible RCDs must be installed.
  • Locating faults is difficult in widespread networks.
  • When an insulation fault with reference to the earth occurs, the voltage of the two healthy phases in relation to the earth take on the value of the phase-to-phase voltage So when Select Size of equipments it is need to higher insulation level of the Equipments.
  • The risk of high internal over voltages making it advisable to reinforce the equipment insulation.
  • The compulsory insulation monitoring, with visual and audible indication of the first fault if tripping is not triggered until the second fault occurs.
  • Protection against direct and indirect contact is not guaranteed.
  • 10. Short-circuit and earth fault currents may cause fires and destroy parts of the plant.
回复 支持 反对

使用道具 举报

龙船学院
发表于 2015-6-29 21:24 | 显示全部楼层 来自: 中国北京
对低压系统,发电机中心点不接地,但发电机壳体和配电板壳体以及配电板内非导电金属,还有电力电缆金属外保护套都要接地,防止由于电路中的任何一相由于绝缘故障,导致所术部分带电,引起人员接触而出现触电。
回复 支持 反对

使用道具 举报

发表于 2015-6-29 21:32 | 显示全部楼层 来自: 中国北京
另一个要素也得考虑

发电机壳体,配电板壳体,电力电缆外保护套接地,也是为了减少电磁辐射以便降低对电子通信导航系统的干扰,这是很重要的一个因数。
回复 支持 反对

使用道具 举报

发表于 2015-7-2 12:27 | 显示全部楼层 来自: 中国江苏南通
设备外壳是必须可靠接地的
回复 支持 反对

使用道具 举报

发表于 2016-4-26 16:58 | 显示全部楼层 来自: 中国湖北
学习了,还有就是中性点和外壳接地不能连在一起
回复 支持 反对

使用道具 举报

发表于 2016-4-27 10:36 | 显示全部楼层 来自: 中国香港
三相三线与三相四线相比没有中线,四线制中的中线需要在发电机端和 负载端接地 形成回路电流。

AC或DC超过50V的设备外壳需要接地是PE,保护性接地一般是黄绿线,正常没有电流,万一内部漏电,防止人触电的。

以上二者作用不同不可混为一谈。