根据ABS规范 4-6-2/9.13.3 中的要求:Where an inlet or discharge is to pass through a wing tank or a cargo hold, the valve may be installed on the inner bulkhead or similar location provided that the pipe between the valve and the shell is of wall thickness not less than as specified above, with all joints welded and with built-in provision for flexibility.
是否可以这样理解:出舷管应全部为焊接式,且要设置弯管?
|
|