DNV 规范E 100 Hydrostatic testing before installation on board
101 All class I and II pipes and integral fittings, after completion of manufacture but before insulation and coating, if any, shall be subjected to a hydrostatic test in the presence of the surveyor at the following pressureH = 1.5 p