For oil filling lines entering at the top of a tank and with inside extension towards the bottom, air holes shall be drilled in the pipe near the penetration in order to avoid the siphoning effect, refer to Pt C, Ch 1, Sec 10 [11.6.3.c] of the BV Rules.