查看: 4372|回复: 3
收起左侧

[自动化] Bridge Control of Main Engine

[复制链接]
发表于 2010-11-7 17:04 | 显示全部楼层 |阅读模式 来自: 中国山东烟台
Bridge Control of Main Engine
Bridge control of Main Engines:
Automatic control of the starting of the main engine can be done from the bridge as well as in Engine control room. The automatic controls employed in starting the engine is by the following sequence:
  • Automatic control used in correctly positioning of the cam shaft.
  • Admitting starting air
  • Admitting fuel
  • Starting air shut off
  • Speed adjustment to the value required

Thus the engine is started and the various parameters like temperature, pressure, flow and tank level have to measured at every watch to make sure that the engine is running safely.
Temperatures of lube oil, JCW, exhaust gas, etc. are measured.
Pressures of lube oil, JCW, fuel oil, and starting air etc. are measured.
Flow of fuel oil is measured while running.
Tank levels of Heavy fuel oil, diesel oil, and lube oil are measured.
For measuring the parameters we make use of the transducers, in turn sending the input signal to the automatic control system.
回复

使用道具 举报

龙船学院
发表于 2010-11-7 18:28 | 显示全部楼层 来自: 中国山东烟台
main engine control panel is very simple ,I can;t see any problem! If you any problem,pls show me .{:3_52:}
回复 支持 反对

使用道具 举报

发表于 2013-10-27 18:17 | 显示全部楼层 来自: 中国浙江宁波
Main propulsion remote control shall be provided at the bridge as well as in Engine control room
回复 支持 反对

使用道具 举报

发表于 2014-10-11 16:48 | 显示全部楼层 来自: 中国山东烟台
And So ,Any Question?
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2025-1-7 20:04

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表