查看: 2636|回复: 5
收起左侧

[规范公约] Welding of Hull Structures - GL Rules for Construction

[复制链接]
发表于 2008-6-9 14:34 | 显示全部楼层 |阅读模式 来自: 中国广东深圳
A. General
1. Scope
1.1 These rules apply to all welding work carried out on the ship's hull, including the superstructure and deckhouses,  its  internal  and  external  structures,  and equipment  components  forming  part  of  the  ship's structure, e.g. hatch covers, masts, king posts or crane substructures welded to the ship's hull. See also Chapter  1, Section 1, A.1. and A.2.
1.2 They also apply in analogous manner to cargo tanks which  are not  an  integral  part  of  the  ship's  hull and  are  not  pressure  vessels  within  the  meaning  of Section 3 (e.g. prismatic type A tanks, according to the Rules for Construction I, Part 1, Chapter 6).
2. Other relevant rules and regulations
The design and dimensioning of welded  joints  is  also governed by the provisions of the Rules for Construction
  I, Part  1, Chapter  1,  Sections 19 "Welded  Joints and 20 "Fatigue Strength" and the performance of the work is also subject to the provisions of Section 1, N. of  the  said Rules  for Construction. For  other  relevant standards, see Chapter 1, Section 1, B. of these Rules for Welding.
3. Weld performance
Welded  joints  in  hull  structures  shall  be  prepared, made  and  inspected  in  such  a  way  that  their  quality
characteristics are equivalent to those of the base materials to  be  joined.  This  means  that  they  may  not
deviate  from  the  prescribed  form  and  internal  condition by more than the limits allowed by the prescribed
weld quality grades  according  to Table  1.9  or  by  the evaluation  categories  used  as  a  basis  for  the  notch
category classification for the proof of fatigue strength (cf.  Rules  for  Construction  I,  Part  1,  Chapter  1,
Section 20). The same applies in analogous manner to the other quality characteristics; cf. also C.

II - Part 3 Ch 3 Section 1 Welding of Hull Structures.part1.rar (490 KB, 下载次数: 23)
II - Part 3 Ch 3 Section 1 Welding of Hull Structures.part2.rar (113.4 KB, 下载次数: 19)

[ 本帖最后由 FSO_HK 于 2008-6-9 14:46 编辑 ]
回复

使用道具 举报

龙船学院
发表于 2008-6-9 15:17 | 显示全部楼层 来自: 中国上海
搞笑,这还收费!
回复 支持 反对

使用道具 举报

发表于 2008-6-9 16:06 | 显示全部楼层 来自: 中国江苏南通
也许没钱了吧?
回复 支持 反对

使用道具 举报

发表于 2012-4-14 12:38 | 显示全部楼层 来自: 中国浙江温州
我去~~
回复 支持 反对

使用道具 举报

发表于 2012-5-14 23:04 | 显示全部楼层 来自: 中国广东广州
多谢楼主了,很好的资料
回复 支持 反对

使用道具 举报

发表于 2017-8-29 08:23 | 显示全部楼层 来自: 中国江苏苏州
顶一顶,~~~~~~~
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-9-29 03:23

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表