查看: 1872|回复: 3
收起左侧

[培训考试] Frosio资料中/英文版

[复制链接]
发表于 2011-11-30 14:18 | 显示全部楼层 |阅读模式 来自: 中国广东深圳
本帖最后由 richy 于 2011-12-1 13:21 编辑

Frosio-english.part1.rar (1.86 MB, 下载次数: 89) Frosio-english.part2.rar (754.26 KB, 下载次数: 69) FROSIO-chinese.rar (351.86 KB, 下载次数: 71)

Corrective actions should be taken in order to prevent the occurrence of non-conformance.

In a example we will try to illustrate this with a practical case from industry: Some years ago a number of pipelines where ordered outside Norway by one of the Norwegian oil companies. In the specification from the oil company the following text was given:



https://www.imarine.cn/?fromuid=142033


What


Demands


Standard







surface prep.

paint system


Blast-cleaning Sa 2 1/2
ISO 8501 -1

Roughness Grade- medium, G
ISO 8503-1

Coal tar epoxy in 300 um
ISO 2808




No inspection from the Oil Company was carried out during production, and the pipelines were finally delivered to the yard in Norway. During assembly the paint suddenly flaked in large areas, inspection showed that the pipelines had not been blast-cleaned prior to painting. Consequence - all the work had to be carried out once more at a high cost for the foreign yard.
回复

使用道具 举报

龙船学院
 楼主| 发表于 2011-12-6 11:04 | 显示全部楼层 来自: 中国广东深圳
自己坐个沙发吧
回复 支持 反对

使用道具 举报

发表于 2011-12-31 22:41 | 显示全部楼层 来自: 中国浙江舟山
下过后评价:真的很不错的东西!!!
回复 支持 反对

使用道具 举报

发表于 2012-1-2 10:06 | 显示全部楼层 来自: 中国江苏无锡
下来看看是不是一样的~~~
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2025-1-12 04:51

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表