查看: 1608|回复: 2
收起左侧

[外语学习] 专业英语

[复制链接]
发表于 2011-1-11 09:19 | 显示全部楼层 |阅读模式 来自: 中国江苏南通
本帖最后由 simplefish 于 2011-1-11 13:07 编辑

船舶管系工英语.doc (267 KB, 下载次数: 38) 船检业务用英语.doc (56.5 KB, 下载次数: 39)


船检业务用英语
1
、船体
56
分段完工后结构完整性和焊缝检查
Inspection structure integrity and welding seam on completing No.56 block.
上层建筑完后结构完整性检查
Inspection structure integrity after completing the superstructure.
No.8
No9分段合拢后大接头装配精确性和结构完整性检查
Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.
上层建筑合拢后结构完整性检查
Checking structure integrity of superstructure(deckhouse)after closed.
货舱口围板船上安装精度检查
Inspecting fitting accuracy of hatch coaming on berth.
货舱口围板焊接后焊缝检查

I. 管系加工后提交用语(Delivery Expressions after Pipe Processing

1.       这是什么系统的管子?Which system is this pipe for?

2.       这里共计有多少根管子?How many pipe are there altogether?

3.       标明管子的安装方向

Please mark the direction of the installation of the pipes.

4.       设计规定的试验压力是多少?

What’s the designed test pressure? It is 10176X106Pa.

5.       设计规定的最大速度是多少?

What’s the fastest speed of the designed test?

6.       设计规定的振动频率是多少?

What’s the vibration frequency of the designed test?


回复

使用道具 举报

龙船学院
发表于 2011-1-11 09:26 | 显示全部楼层 来自: 中国北京
列些主要内容呀?
回复 支持 反对

使用道具 举报

发表于 2011-1-27 14:32 | 显示全部楼层 来自: 中国江苏镇江
谢谢
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-12-13 00:48

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表