kissiopo 发表于 2012-2-29 10:39
现在是纯讨论公约 请大家注明依据 同时95版的解释 个人认为还是不用的为好 毕竟那只是国内的 对于国际航行 ...
你要解释,我就给你解释。你个人认为是0,那么看这个
Regulation 12 - Doors
(3). Except as otherwise provided in these regulations, the height of the sills of access openings in bulkheads at ends of enclosed superstructures shall be at least 380 mm above the deck.
另外你说的那个什么95版的解释,我不知道你说的是哪个。我只看最新版的公约和MEPC、MSC的文件。
Regulation 3 - Definitions of terms used in the Annexes
10). Superstructure
(a). A superstructure is a decked structure on the freeboard deck, extending from side to side of the ship or with the side plating not being inboard of the shell plating more than 4% of the breadth (B).
(b). An enclosed superstructure is a superstructure with: (i). enclosing bulkheads of efficient construction;
(ii). access openings, if any, in these bulkheads fitted with doors complying with the requirements of [url=mkMSITStore:C:\Program%20Files\Lloyd]regulation 12[/url];
(iii). all other openings in sides or ends of the superstructure fitted with efficient weathertight means of closing.
. A bridge or poop shall not be regarded as enclosed unless access is provided for the crew starting from any point on the uppermost complete exposed deck or higher to reach machinery and other working spaces inside these superstructures by alternative means which are available at all times when bulkhead openings are closed.
|