Second section , the convesion. In this section, not only the VLCC conversion time , but also the time for the newbuilding of top side structure and module. Generally, all of conversion in this step will be full serviced for last section, especially for sructure which not only steel , but also the base for other subject, for examlpe, piping which is the key for successfuly convert to a FPSO, painting, decration, mechenical, eletric. There have a VLCC which I have completed the conversion. She's side shell have been converted for riser/lower baconly, spread mooring system; The new upper deck which include the bulkhead and frame and addtional bracket which have about 5000 pcs in tank for topside sutructure. And the fabriction of hundred thousand pipes must be given more attention for project team. |
|