查看: 1086|回复: 0
收起左侧

Clipper Delivers Gottwald Crane to Altamira Steel Terminal in Mexico

[复制链接]
发表于 2013-3-5 17:44 | 显示全部楼层 |阅读模式 来自: 中国辽宁大连
Clipper Delivers Gottwald Crane to Altamira Steel Terminal in Mexico
                        Posted on  Mar 5th, 2013          


On 19 February 2013, IPA Steel Terminal in Altamira, Mexico, received their 100 mt Gottwald crane. The new crane, additional to the terminal’s 150 mt link belt crawler, arrived from Manzanillo and is fully operational.
With this new acquisition, the terminal is well equipped to handle a variety of heavy lift and project cargo, such a turbines and wind mills.
Other recent developments of the terminal’s modern cargo handling facilities include the purchase of ten additional fork lifts ranging from 36,000 to 92,500 lbs during 2012.
Clipper is one of four shareholders in the IPA Steel Terminal. It is the only dedicated steel and break bulk terminal in Altamira.


回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-11-15 04:24

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表