These photos are S266 ship, and same before ship S265 Now S214/215/216 are same drawing.
Have many electric control boxs in this space behind of E/C/R. But now have steam pipe pass through the space on the top of electric box, If the packing of steam pipe flange leak during alongside the port or in rough sea, you know which result will be happened. Pls consider to modify in advance.
Design reply:As the comment,We will be in front of the steam pipe into the E/C/R add a globe valve, in order to control the steam。
些照片是SS194船,之前是SS130船,现在SS234/235/236也是同样的图纸。
在E/C/R后面的这个空间有很多电控箱。但是现在有蒸汽管道通过电箱顶部的空间,如果蒸汽管道法兰的包装在港口边或在波涛汹涌的海上泄漏,你知道会发生什么结果。请提前考虑修改。
设计答复:作为评论,我们会在蒸汽管道进入E/C/R前加一个截止阀,以控制蒸汽。