Verifythat the emergency power available is sufficient to supply the total connectedloads that are assumed to be operated simultaneously, except for non-emergencyloads with UVP. (The analysis may be divided into emergency condition andthe dead ship condition, since loads for dead ship start is normally less thanthat for emergency condition, load analysis for dead ship start may not beconsidered.)
不知道你的是哪个船级社? ABS的Part 4 Chapter 8 Section 2 5.5 Emergency Services (2012) i) The electrical power available from the emergency source is to be sufficient to supply all those services that are essential for safety in an emergency, due regard being paid to such services as may have to be operated simultaneously. Where the sum of the loads on the emergency generator switchboard exceeds the power available, an analysis demonstrating that the power required to operate the services simultaneously is to be produced. The analysis is to be submitted for review in support of the sizing of the emergency generator. 应该是要求要进行负荷分析。