查看: 2496|回复: 0
收起左侧

FW:Yokogawa to Supply Equipment for Ichthys Project LNG Carrier

[复制链接]
发表于 2014-2-25 19:40 | 显示全部楼层 |阅读模式 来自: 新加坡
Yokogawa Electric Corporation has received an order from Kawasaki Heavy Industries, Ltd. to supply the control system for an LNG carrier that is being built for the Ichthys LNG project in Australia.
The ship will be the world’s largest Moss-type LNG carrier and will be used for transporting LNG from an onshore LNG processing plant that is being constructed as part of the Ichthys LNG project. The ship is scheduled to enter service by the end of 2016, in time for the completion of the plant. The ship is also the first Moss-type LNG carrier equipped with a dual fuel diesel engine (DFDE), which burns both fuel oil and gas.
Yokogawa will deliver the CENTUM® VP integrated production control system for monitoring and controlling the LNG carrier’s LNG tanks and loading/unloading facilities as well as the supply of gas to the DFDE and the supply of power to other driving units. Yokogawa will also be responsible for the engineering and commissioning of the control system.


http://worldmaritimenews.com/arc ... roject-lng-carrier/
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-11-14 14:33

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表