查看: 4144|回复: 6
收起左侧

[海工辅助船] 求教 container loading station

[复制链接]
发表于 2013-4-10 19:35 | 显示全部楼层 |阅读模式 来自: 中国上海
20金币
求教,布置在海工船左右舷各一个的container loading station;
请问哪位大侠有更详细的信息或图片?以及哪个设备厂家可以提供?
特别注明:安装在海工船上的,而不是陆地上的~
非常感谢!

回复

使用道具 举报

龙船学院
发表于 2013-4-15 23:02 | 显示全部楼层 来自: 中国山东烟台
  hose loading station?
hose.JPG

评分

参与人数 1 +5 收起 理由
创世冰皇 + 5 感谢分享

查看全部评分

回复

使用道具 举报

 楼主| 发表于 2013-4-20 09:07 | 显示全部楼层 来自: 中国上海
外形有点像,能介绍一下您这个HOSE LOADING STATION吗?
回复

使用道具 举报

 楼主| 发表于 2013-4-20 09:22 | 显示全部楼层 来自: 中国上海
战争在召唤 发表于 2013-4-15 23:02
hose loading station?

外形有点像,能介绍一下您这个HOSE LOADING STATION吗?
回复

使用道具 举报

发表于 2013-4-21 21:31 | 显示全部楼层 来自: 中国山东烟台
The hose reel station consist of one skid frame containing one hose reel unit for each hose and
a hydraulic power unit.

Each hose reel unit consists of:
Hosereel foundation
Hosereel
Vertically mounted slewing bearing.
Hosereel drive machinery (gear, brake and hydraulic motor)
Swivel
Loading hose

The HPU consists of:
Hydraulic oil tank with low level switch.
Hydraulic pump with electric motor drive.
Electrical start/stop panel with emergency stop.
Portable Control Unit with emergency stop.

All equipment are located at the skid frame.
This Hose reel station is designed for bunkering from maximum three (3) hoses at the same time.
However, only one hose reel can be operated (reeled) at the time.  

Select the hose reel to be operated at HPU hosereel selection block.  
Hoses for liquid bulk.

These hoses are permanently connected to their re spectively platform/vessel storage tank
pipelines through a swivel system. It may be necessary to  open the block valve for these systems
(Follow the platform regulations) before the loading operation takes place (Block valves are not a
part of the HRS).  
Hoses for dry bulk  

These hoses must be completely reeled out and located in loading position before the short
flexible hoses from the dry bulk system is connected to the loading hose located in the middle of
the drum. These hoses must  be connected to their respectively platform storage tank pipelines
via short, flexible, hoses and the block valve for these systems (Follow the platform regulations)
must also be opened before the bunkering operation takes place (Block valves are not a part of
the HRS.

评分

参与人数 1金币 +6 收起 理由
创世冰皇 + 6 技术指点-虽然说的不是那个东东,但是却让我.

查看全部评分

回复

使用道具 举报

 楼主| 发表于 2013-4-26 23:05 | 显示全部楼层 来自: 中国上海
战争在召唤 发表于 2013-4-21 21:31
The hose reel station consist of one skid frame containing one hose reel unit for each hose and
a  ...

虽然说的不是那个东东,但是却让我了解了软管卷筒,谢谢~
回复

使用道具 举报

发表于 2013-7-12 13:21 | 显示全部楼层 来自: GOOGLE
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-12-25 14:25

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表