Panama Canal Tonnage measurement certificate
Note: (The Builder shall provide the documents and drawings for the vessel’s canal transit in accordance with the Panama Canal Universal Measurement System (PC/UMS) instead of tonnage certificate, as required by the Panama Canal Authority)