查看: 2135|回复: 1
收起左侧

BILGE SYSTEM

[复制链接]
头像被屏蔽
发表于 2008-4-13 17:50 | 显示全部楼层 |阅读模式 来自: 中国浙江宁波
BILGE SYSTEM

Bilge in the pump room is to be pumped out to slop tank by the cargo oil stripping pump.

Bilge in the chain lockers and boatswain’s store is to be discharged overboard by water eductors.

Bilge in the steering gear room and emergency fire pump recess is to be led to the bilge well in the engine room by gravity.

Bilge in fore peak tank (void) is to be discharged overboard by water eductor.

A water eductor is to be provided in fore peak tank (void) and to be supplied with sea water from fire/wash deck line.
回复

使用道具 举报

龙船学院
发表于 2008-4-17 13:46 | 显示全部楼层 来自: 中国河北秦皇岛
学习中。。。。。。。。。。
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-11-16 04:52

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表