|
发表于 2012-3-2 14:24
|
显示全部楼层
来自: 中国浙江台州
DNV规范的要求,必须要有的,在控制站的位置,至于在克令吊筒体入口处的没有强制要求,但是我个人建议布置一个。引用如下:
A manually operated emergency stop function, leading to shutdown and stop of the crane movements, shall therefore be fitted.
Simultaneously, the brakes shall be engaged in a progressive and safe manner. The emergency stop shall retain its
function regardless of any malfunction in the crane’s control system. Emergency stop actuators shall be located at convenient
locations at control station for immediate use by personnel in the event of a hazardous situation occurring.
|
|