|
The following is the opinions of ABS surveyor
1.All metallic coverings of power and lighting cables passing through hazardous areas or connected to equipment in such an area are to be earthed at least at each end. See 4-6-3/7.9 of SVR Under 90m.
2.For penetration through insulated, refrigerated space bulkheads, cables are to be installed in phenolic pipes or similar heat-insulating material joined to the bulkhead stuffing tube, or a section of such material is to be inserted between the bulkhead stuffing tube and the metallic pipe. See 4-6-3/5.27 of SVR Under 90m。
can you tell me ?
|
|