请高手帮忙翻译下

[复制链接]
发表于 2011-9-8 19:57 | 显示全部楼层 |阅读模式 来自: 中国江苏泰州
During inspection of G/E exh. pipe system we found that exh. pipes were not supported
correctly, according to maker's instruction the exhaust pipe must not be exerted any force against gas outlet on the
engine, the sturdy fixed-point support must be provided  for the bellows one the turbocharger, it should be
positioned immediately above the bellows in order to prevent the transmission of force, thus shipyard be requested
to add supports for mentioned exhaust pipes and the rest verticatly installed bellows as well, the detail drawing
need to present to owner for apporval. this claim is apply to all 4 vessels.
回复

使用道具 举报

龙船学院
 楼主| 发表于 2011-9-8 20:15 | 显示全部楼层 来自: 中国江苏泰州
大家帮帮忙啊 ,谢谢
回复 支持 反对

使用道具 举报

发表于 2011-9-8 20:43 | 显示全部楼层 来自: 中国浙江舟山
回复 1# 517137258


    。。。。
回复 支持 反对

使用道具 举报

发表于 2011-9-8 21:03 | 显示全部楼层 来自: 中国浙江舟山
回复 1# 517137258


    During inspection of G/E exh. pipe system we found that exh. pipes were not supported
correctly, according to maker's instruction the exhaust pipe must not be exerted any force against gas outlet on the
engine, the sturdy fixed-point support must be provided  for the bellows one the turbocharger, it should be
positioned immediately above the bellows in order to prevent the transmission of force, thus shipyard be requested
to add supports for mentioned exhaust pipes and the rest verticatly installed bellows as well, the detail drawing
need to present to owner for apporval. this claim is apply to all 4 vessels.
    发电机排气管路的支撑有问题,根据要求支撑应该加在增压器下面。。。。船东要求,他们的4条船都要修改,图纸要给船东审核。。
回复 支持 反对

使用道具 举报

 楼主| 发表于 2011-9-10 12:53 | 显示全部楼层 来自: 中国江苏徐州
回复 4# shipyang0820


    谢谢啊
回复 支持 反对

使用道具 举报

发表于 2011-9-17 20:36 | 显示全部楼层 来自: 中国上海
没翻译完全啊