[其他资料] 981设备清单-仅供参考(10)

[复制链接]
发表于 2011-6-10 21:49 | 显示全部楼层 |阅读模式 来自: 中国辽宁大连
BOP/ Xmas Tree / Riser Handling Sys**
BOP Trolley
SWL = 600 mT, Rail Span: 10.6 m1
BOP and LMRP Skid
BOP skid = 400 mT, LMRP skid = 200 mT1
Racks & Rails
1
BOP Crane
SWL = 2 x 300 mT, Railspan TBD1
LMRP Skid
SWL = 200 mT, Rail Span: 4.8 m1
X-mas Tree Trolley
SWL = 275 mT, Railspan TBD (used for offline casing building of large (above 9 5/8" casing)1
X-mas Tree Crane
SWL 2 x 275 mT, for offline casing stand building1
X-mas Tree Trolley

SWL 275 mT
1
Riser Fingerboard
Riser diameter - 54 +/- 0.5" , Riser length - 75 feet (22.86m)None
Underhull Guide

For guiding 600 mT BOP
2
Underhull Guide Support
2
Riser Handling Crane
Riser handling Gantry crane 40 mT, rail span TBD1
Riser Handling Crane Rail
1
Riser Inspection Stool

Not required

None
Riser Chute
Not requiredNone
Trolley for Guiding
Not requiredNone
Casing Building Deck
300T SWL, Part of X-mas tree handling trolley1
回复

使用道具 举报

龙船学院
发表于 2011-6-20 21:34 | 显示全部楼层 来自: 中国辽宁大连
什么东东?求解释
回复 支持 反对

使用道具 举报

发表于 2011-6-20 21:35 | 显示全部楼层 来自: 中国辽宁大连
什么东东?求解释
回复 支持 反对

使用道具 举报

发表于 2011-6-20 21:38 | 显示全部楼层 来自: 中国辽宁大连
什么东东?求解释
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-12-13 04:02

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表