查看: 3181|回复: 3
收起左侧

[设计制造] 关于三用工作船AHTS规格书中,crash bar, crash bar chock是什么东西,怎么操作?

[复制链接]
发表于 2011-5-3 16:02 | 显示全部楼层 |阅读模式 来自: 中国上海
1、Crash bar/Cargo Rails & Pipe Stanchions
Cargo rails made of 8” N.B., Sch. 120 pipes to sustain minimum 100T compressive strength are to be fitted longitudinally along the main deck for the stowage of pipes, etc. on P+S. To be fitted around cargo area of main deck. 4” N.B. Sch 80 portable pipe stanchions are to be arranged P+S for deck cargoes
The crash bar/cargo rail ends shall be properly finished on to the stern fairing plates with good sloping to enable the tow wire to slip on it smoothly. A stopping arrangement (horn)
is to be built on the P&S side cargo rail to prevent rope coming on to the structure. The height of cargo rail/crash bar is to be 1.6 m and below the centerline of tow winch drum.

2、Crash bar chocks
Crash bar chocks are to be provided on either side crash bar/cargo rail with sufficient angle from gob eye (aft of gob eye)

最好能有照片。
回复

使用道具 举报

龙船学院
 楼主| 发表于 2011-5-4 08:01 | 显示全部楼层 来自: 中国上海
有知道的高人,出来解释下
回复 支持 反对

使用道具 举报

 楼主| 发表于 2011-5-5 08:28 | 显示全部楼层 来自: 中国上海
知道的人应该很多,怎么没人回答,问题太肤浅了?
回复 支持 反对

使用道具 举报

发表于 2012-1-12 11:15 | 显示全部楼层 来自: 中国江苏南通
楼主是HH的?你那有AHTS规格书?
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|标签|免责声明|龙船社区

GMT+8, 2024-12-27 14:22

Powered by Imarine

Copyright © 2006, 龙船社区

快速回复 返回顶部 返回列表