NO.3 hold ballast opening to be provided with suitable covering arrangement(also securing for the same)for the loaded voyage operation. Hold no.3 ballast suction wells should be recessed in DB tank and not in the pipe tunnel. Ballast line connection from the pipe tunnel to be extended to ballast well in the DB tank on port as well as Stbd side. |
|