DYNAMIC POSITIONING SYSTEM
• Kongsberg Simrad SDP21 system to Lloyd’s DP (AA) standard
• Kongsberg Simrad HiPAP 500 HPR system
• 3 x DGPS Position Reference Systems
• 2 x MRU Motion Reference Sensors
• 3 x Gyro Compasses
HYDROGRAPHIC & SURVEY EQUIPMENT
• Kongsberg Simrad installation, EA 400 Single Beam with
EM 3000 multi-beam units with ship motion and sea
condition sensors plus Kongsberg Neptune, C-floor, Triton
and Poseidon software for processing with printing to AO
• 1 x Sonar CH37, Furuno
• 1 x 25-tonne crane @ 20m - Main Crane, starboardmounted.
Subsea rated to 70 metres
• 1 x 13-tonne crane – General Purpose Telescopic Crane,
OIL SPILL RESPONSE and CLEAN-UP EQUIPMENT
• Ayles Fernie Oil Spill Dispersant Chemical Spray System
• 6-metre spray booms deployed port and starboard
• 400-metres of containment boom
• Termite Oil Skimmer Unit
• 2 x Oil Recovery Tanks 87 m3 each
Max Deck Loading: 5 tonne/m2
ROV Support Activity: Use of command container modules
Container Carriage: 12 x 20-foot TEU, 11 of which may be Refrigerated
Power: 11 x 15Kva 4 pin Seaform sockets
Towing Pins: Karmoy Forks SWL 300 tonne
Tugger Winches: 2 x SWL 5 tonne